Installation, use and maintenance
M0546
10 /6 0
7.2 CONTENT OF THE PACKAGING/PRELIMINARY INSPECTION
Foreword Before assembly, make sure the machine is integer controlling all parts for
possible damage that could hinder safety and functionality.
In case of doubt, do not start up and contact the manufacturer’s technical
service.
Control if the accessory set is complete.
At the end of the inspection, assemble CUBE B.SMART:
1
INSTALL THE
PIPE-HOLDING
HOOK
2
INSTALL THE
ROCKER
OPERATING
LEVER
INSTALLATION
EXAMPLE