21/124
EN
21 /6 0
This manual belongs to PIUSI S.p.A. The reproduction of all or parts is prohibited.
CUBE
EN (translated from Italian)
14.2 STATION FIXING
Before starting installation, check that any packaging materials have not been trapped in the pipes.
Prepare suitable support clamps or fixing brackets according to the position in which you want to fix
CUBE B.SMART. The pipe coming from the tank must be aligned with the threaded inlet of the pump
filter, located under CUBE B.SMART.
TANK ABOVE
GROUND
MAX.
MIN.
Hp
TANK UNDERGRO
UND
Hp
MAX.
MIN.