Quick Start
See Installation & Startup for additional information.
1
All units:
Connect process lines
Water-cooled units:
A. Connect process lines
B. Connect facility water lines
C. Turn facility water ON
2
Fill reservoir with coolant
3
Connect electrical power to
Mains
4
Turn Power Switch / Circuit
Breaker ON
5
Turn Controller ON
6
Add coolant to reservoir as
process lines fill
7
Enter temperature set point