EasyManua.ls Logo

Potterton Paramount five 80 - Settings; Parameter List Overview

Potterton Paramount five 80
156 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 Settings
9.1 List of parameters
See
Subject to system configuration, not all parameters listed in the
parameter list will be shown on the display.
To reach the end user (Eu), Commissioning (C) and Engineer
(E) setting levels:
1
.
Press the OK button.
2
.
Then press the information button for approx. 3 s.
3
.
Select the circuit using the control knob.
4
.
Confirm with the OK button.
Time of day and date Prog. no. Level Standard value
Hours / minutes 1 Eu 01:00 (h:min)
Day / month 2 Eu 01.01 (day.month)
Year 3 Eu 2030 (year)
Start of summertime 5 E 25.03 (day.month)
End of summertime 6 E 25.10 (day.month)
Operator section Prog. no. Level Standard value
Language 20 Eu English
Info
Temporarily | Permanently
22 E Temporarily
Contrast of display 25 Eu
Operation lock
Off | On
26 E Off
Programming lock
Off | On
27 E Off
Units
°C, bar | °F, PSI
29 Eu °C, bar
Save basic settings
(1)
No | Yes
30 E No
Activate basic settings
(2)
No | Yes
31 E No
Used as
(1)
Room unit 1 | Room unit 2 | Room unit 3 | Operator unit 1 | Operator unit 2 |
Operator unit 3 | Service unit
40 C Room unit 1
Assignment device 1
(3)
Heating circuit 1 |Heating circuits 1 and 2 |Heating circuits 1 and 3/P |All heating
circuits
42 C Heating circuit 1
Operation HC2
(1)
Jointly with HC1 | Independently
44 C Jointly with HC1
Operation HC3/P
(1)
Jointly with HC1 | Independently
46 C Jointly with HC1
Room temperature device 1
(1)
Heating circuit 1 only | For all assigned HCs
47 C For all assigned HCs
Occupancy button device 1
(1)
None | Heating circuit 1 | For all assigned HCs
48 C For all assigned HCs
9 Settings
62 Paramount five 30 – 115 7703046 - 01 - 23072018

Table of Contents

Related product manuals