EasyManuals Logo
Home>Precor>Fitness Equipment>move beyond S3.15

Precor move beyond S3.15 User Manual

Precor move beyond S3.15
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #12 background imageLoading...
Page #12 background image
S3.15 Assembly and Maintenance Guide
page 12
1 2 3 4 5 6
D. Slide a Plastic Washer and a Roller Pad onto one
end of a Roller Pad Rod. Insert one Mushroom
Cap to plug the end hole. If necessary, pound the
Mushroom Cap in place using the rubber mallet.
E. Insert the Roller Pad Rod through the hole in the
Leg Extension Arm.
F. Slide the remaining Plastic Washer and Roller Pad
on the other end of the Roller Pad Rod. Insert one
Mushroom Cap to plug the end hole. If necessary,
pound the Mushroom Cap in place using the
rubber mallet.
G. Attach the Floor Plate using
two ³⁄₄-inch buttonhead bolts
Wrench tighten using a 6mm hex key.
D
Roller Pad
Plastic Washer
E
Roller
Pad Rod
Mushroom Cap
F
G
2 - ³⁄₄" buttonhead bolts
Floor
Plate
Step 3. Install Seat and Rollers, continued

Other manuals for Precor move beyond S3.15

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Precor move beyond S3.15 and is the answer not in the manual?

Precor move beyond S3.15 Specifications

Weight and Dimensions IconWeight and Dimensions
length72 inches (182 cm)
height83 inches (211 cm)
width51 inches (130 cm)
shipping weight221 lb (100 kg)

Related product manuals