EasyManua.ls Logo

ProTec Polymer Processing FG 204 - Commissioning and Control System; Commissioning Steps

Default Icon
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ProTec Polymer Processing GmbH Foerdergeraet_FG201-FG206_BA_1v0_2018_en
35
5 Commissioning
Warning!
Non-compliance with the operating manual can lead to
personal injury and machine failure.
The operating manual, especially the safety instructions,
must be read and complied with by every person that
works with the system.
1. Connect the conveyor with the power plug to mains power.
Pay attention to the voltage of the mains power when doing this!
2. Insert the suction hose in the material to be conveyed.
Refer to the chapter Mounting a suction hose, on page 31.
3. Start conveyor.
4. Check function.

Table of Contents

Related product manuals