ProTec Polymer Processing GmbH Foerdergeraet_FG201-FG206_BA_1v0_2018_en
68
After maintenance
1. Set the dosing attachment on the conveying goods container.
2. Fasten the lever tensioning ring.
3. Place the filter insert on the dosing attachment.
4. Place the blower insert on the dosing attachment.
5. Fasten locks (51).
6. Mount the conveying hoses.
7. Connect the device to the compressed air supply.
8. Connect the compressed air supply line (1) on the control valve.
9. Establish compressed air supply.
10. Connect the device to mains power.