EasyManua.ls Logo

Pulsar Infinity PS-2SD - Page 27

Pulsar Infinity PS-2SD
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pulsar® Infinity Operation and Installation ManualWater Treatment 27
STEP 2 – Complete the drain/vent by putting the ball valve at the end of the Tee to contain the flow during normal operation of the
feeder.
NOTE: You can orient the Tee in any configuration as long as the check valve is oriented to draw air in the feeder during venturi
suction.
8.2 Vent Installation for Feeder Draining if used with an ORP kit (continued)