Maintenance and service 12
116
Case 1:
Bolt can be inserted into the metering opening and has less than 1 mm
clearance.
The setting is good.
Remove the bolt from the metering opening.
Reassemble the spreading discs.
Case 2:
Bolt can be inserted into the metering opening and has more than 1 mm
clearance.
A new setting is required.
Remove the bolt from the metering opening.
Proceed with chapter [12.5.2].
Case 3:
Bolt cannot be inserted into the metering opening.
A new setting is required.
Remove the bolt from the metering opening.
Proceed with chapter [12.5.2].