EasyManua.ls Logo

Rauch MDS 8.2 - 7 Commissioning; Accepting the Machine; Tractor Requirements

Rauch MDS 8.2
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
39
7
7 Commissioning
7.1 Accepting the machine
When accepting the machine, please check the completeness of the delivery.
The standard equipment includes
1 MDS series mineral fertiliser spreader
1 MDS operator’s manual
1 fertiliser chart (CD)
1 calibration kit comprising chute and calculator
Lower link and upper link pins
1 agitator
Protective grid in hopper
1 spreading disc set (according to order)
1 universal drive shaft (including operator’s manual)
Version Q: QUANTRON-A control unit (including operator's manual)
Version C: E-CLICK control unit (including operator's manual)
Also check any optional equipment that you ordered.
Check for any shipping damage or missing parts. Have any shipping damage
confirmed by the forwarding agent.
If in doubt, contact your salesperson or the manufacturer directly.
7.2 Tractor requirements
To ensure a safe and correct use of the machine of the MDS series, the tractor
must meet the necessary mechanical, hydraulic, and electrical requirements.
Universal drive shaft connection: 1 3/8 inches, 6-part, 540 rpm (alternatively
8 x 32 x 38, 540 rpm),
Oil supply: max. 200bar, single- or double-acting valve (depending on equip-
ment) for hydraulic metering slide actuator,
On-board voltage: 12 V,
Category I and/or II three-point linkage (depending on the type).
NOTICE
When receiving the machine, check that all attached components are correctly
and securely tightened.
The right-hand spreading disc and left-hand spreading disc must be mounted
facing the direction of travel.

Table of Contents

Other manuals for Rauch MDS 8.2

Related product manuals