Machine settings 8
76
Preparing three passages:
Choose a similar fertiliser from the fertiliser chart and adjust the spreader ac-
cordingly.
Set the mounting height of the machine as specified in the fertiliser chart.
Make sure that the mounting height includes the top edge of the trays.
Check the spreading elements (spreading discs, spreader vanes, outlet) for
correct functioning and completeness.
Place two collecting vessels each, one after another, at a distance of 1 m in
the overlap zones and in the centre track (according to figure 8.14
).
Run the spreading test with the open position that has been decided on for
operation:
Forward speed: 3 - 4 km/h.
Spread along the tramlines 1-3 one after the other.
Open the metering slide 10 m in front of the collecting vessels.
Close the metering slides approx. 30 m behind the collecting vessels.
8.5.4 Evaluate the results and correct if necessary
Pool the contents of the collecting vessels placed one after another and pour
them into the measuring tubes from the left-hand side.
The quality of the horizontal spreading pattern can be read off the three meas-
uring tubes.
Figure 8.15: Possible results of pass
[A] All tubes contain the same amount.
[B] Asymmetrical fertiliser distribution
[C] Too much fertiliser in the overlap zone
[D] Too little fertiliser in the overlap zone
NOTICE
If the quantity collected in the collecting vessels is insufficient, repeat the passage.
Do not change the adjustment of the metering slides.
A
100%
B
100%
C
100%
D
100%