EasyManua.ls Logo

RBI Boiler - Page 51

RBI Boiler
154 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
51
Figure 9-2 Condensate pipe and drain
C
A
D
B
020010.01.029
Figure 9-1 Condensate neutralizer box (see also Figures 3-3 throgh 3-10, Item 3)
A = Pipe connected to the heaters’
ue exhaust system
B = Condensate neutralizer box
C = Condensate drain pipe
D = Cover of the box
A = Condensate drain pipe
B = Floor drain or drain pan (Below this point there must
be a trap capable of preventing the return of sewer gas)
9 - INSTALLATION - Condensate disposal

Table of Contents

Related product manuals