11 Deployment Guide
Use the following steps and the Quick Reference card to setup the Work-
Horse for a Self-Contained deployment.
11.1 Deployment Checklist
Test the ADCP using WinSC
Seal the ADCP for deployment
Install new o-rings; use silicone lubricant
Use fresh desiccant (2 bags) inside ADCP
Install and connect the battery
Check Recorder PC card is installed
Visually inspect the ADCP
Check the transducer head condition
Check the zinc anode condition (High Pressure Housing only)
Check the housing paint condition (High Pressure Housing only)
All mounting hardware installed
Transducer faces clean and free from defects
Verify the compass alignment using WinSC; if necessary, re-calibrate
Check recorder status using WinSC
Are biofouling precautions needed?
Verify battery and recorder space requirements
Zero pressure sensor (optional) at deployment site with AZ-command
Install the dummy plug; use silicone lubricant

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the RD Instruments WorkHorse Sentinel and is the answer not in the manual?

RD Instruments WorkHorse Sentinel Specifications

General IconGeneral
BrandRD Instruments
ModelWorkHorse Sentinel
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals