WorkHorse Sentinel User's Guide
page 26 RD Instruments
11.2 Prepare the ADCP for Deployment
I/O CABLE
POWER SUPPLY
24 VDC
COMPUTER
ADCP
10 MB
MEMORY CARD
400 Wh BATTERY
(NOT CONNECTED)
Figure 10. Prepare the ADCP
Things to remember while preparing the ADCP.
Use the Deployment Checklist to verify that the ADCP is ready for
the deployment.
Test the ADCP using WinSC. Some tests will fail if the ADCP is not
placed in water while the tests are being run.
Use the AC power supply while testing the ADCP. Save the batter-
ies for deployments.
Desiccant lasts a year at specified WorkHorse deployment depths
and temperatures. Remember that desiccant rapidly absorbs mois-
ture from normal room air. Replace the desiccant whenever the
WorkHorse housing or end-cap is removed.
Verify the compass calibration.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the RD Instruments WorkHorse Sentinel and is the answer not in the manual?

RD Instruments WorkHorse Sentinel Specifications

General IconGeneral
BrandRD Instruments
ModelWorkHorse Sentinel
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals