10.2. Precautions for maintenance
1. Please keep the equipment power distribution cabinet clean and tidy, do not pile up debris, and avoid short
circuits.
2. Please keep the inside and outside of the equipment clean and tidy. All sliding surfaces, screw rods, racks,
gear boxes, oil holes, etc. are free of oil; no air or oil leaks at all parts; sundries and dirt around the equipment
should be cleaned up.
3. The water discharge valve of the air compressor tank should be opened once a day to drain the oil and
water, and check whether the oil level meets the standard of use every day. The new machine needs to
replace the lubricating oil every 2500-3000 hours of operation.
4. Tighten the screws at the equipment connection every day, and replace the screw rod every three months
where the screws are frequently loosened to prevent the screw rod from breaking.
5. Please add lubricating oil to the gears, racks and gear boxes regularly. The rack or gear needs to be filled
with grease once every half a month, and the gear oil needs to be replaced every three months in the gear
box.
6. Please use the equipment strictly in accordance with the instruction manual, and it is strictly forbidden to
disassemble the machine parts without the guidance and assistance of professionals.
7. If the power supply of the unit is used to supply power to the self-equipped generator, the rated power
generation of the generator must be greater than 2-4 times the total power of the equipment, and the voltage
fluctuation is less than 380V±5%, otherwise it will cause damage to the equipment and affect the installation
The time schedule of commissioning, training and maintenance shall be fully borne by the user.
8. After receiving the goods, the user immediately inspects the equipment and parts. If it is found to be
damaged in transportation, it shall immediately report to the company and negotiate with the transporter of