EasyManua.ls Logo

Reflex GX616 - Use and Operation; System Operation

Default Icon
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Use and operation
5.1 System operation
Note: The operation can only be performed after ensuring that the circuit is normal and the grounding
wire is tight.
There is an obvious grounding point inside the electric control box of the equipment. The PE wire must be
connected to the grounding point when the equipment is installed, but it is never allowed to connect the N (
zero line) to the grounding point! For the first time, it is recommended that you run the main engine dry for 2
hours before entering the steel bar test machine!
(1) First turn on the main power supply;
(2) Install the operating platform, the direction is the same as the front of the machine, the operator faces the
operating platform, and opens the pneumatic door of the automatic guard of the traction wheel.
(
3
)
I
n
s
e
h
e k
e
y a
n
d t
u
r
n o
n t
h
e
s
y
s
t
e
m p
o
w
e
r
k
e
y s
w
i
t
c
h
(
4
) M
a
n
u
a
l o
p
e
a
t
i
o
n
:
HMI
limitBedin
g
Tractionalarm
resetStart
emer
g
en
Manual
tractiont
raction
single/
most
Manual/
origin/aut
o
Power
indicator
switch
Manual
bending
OperationManualReflexFastFormGX616CNCRebarStirrupBendingMachine