4. Installation and debugging
4.1 Equipment installation conditions, installation technical requirements
①A four-core copper-core cable with a long distance between the equipment provided by the user and the
electrical box, with a specification of 3×16+1x10mm² and above, and properly grounded as required;
②The switch specification in the user-supplied electrical box is a 3-phase 4-pole air switch with a rated
current of 150A or more. If a leakage switch is used, the rated current should be more than 150A and the
leakage action current should be more than 150mA. And must be reliably grounded;
③The installation site is 5 meters wide and 36 meters long, and the cement level is on the ground. The main
machine occupies 14×15.3 meters, and the disc wire rack and steel bars occupies 5×25 meters. The site is
required to be sheltered from wind and rain to prevent the precision electronic components of the equipment
from getting wet, which may cause damage to the equipment.
4.2 Installation and debugging methods and matters needing attention
①Use crane or forklift mainframe with a load-bearing capacity of ≥5T to place it in the working position;
②Connect the console and the host well;
③Connect the air compressor to the main engine;
④Assemble the disk and round frame and place it in a reasonable position;
⑤Run the equipment dry, if there is no fault, you can penetrate the steel bar for trial production;
⑥ After the test run is normal, fix the disc round frame, main machine, and plate reinforcement frame with
anchor bolts firmly.
4.3 Before trial run, trial run
Before trial operation, check whether the power supply voltage is abnormal, whether it is within three-phase
380V±5%, whether the wire ends of the connecting wires in the electrical box are off, especially the
connection of the PE grounding wire, confirm that there is no abnormality, and then turn on the main power
switch. During the trial run, the traction and bending speed should not be driven too fast to avoid collision.
The test graphics range from simple to complex. When the trial run is correct, the speed can be gradually
increased for normal production