I. AUTOMATIC FIRE EXTINGUISHER
F. HOLDING EMPTYING POINT
E. HOLDING TANK
L. BATTERY SWITCH
J. ANCHOR STRONG POINT
C. WATER TANK
B. FUEL TANK FILLING POINT
A. FUEL TANK
D. WATER TANK FILLING POINT
H. THRU-HULL FITTINGS
K. TOWING STRONG POINT
N.MANUAL FIRE EXTINGUISHER
M. BILGE PUMP
KEY
G. SEACOCKS
6/3/14
APPROVED BY:
REGAL MARINE INDUSTRIES
2300 JETPORT DRIVE
ORLANDO, FLORIDA 32809
TEL (407) 851-4360
-
6
2 OF 2
DATE:
DWG. NO.:
DRAWING TITLE:
ALL RIGHTS RESERVED
PAGE:
DRAWN BY:
REVISION:
PROPRIETARY AND CONFIDENTIAL:
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF REGAL MARINE
INDUSTRIES. ANY REPRODUCTION IN PART OR AS WHOLE WITHOUT THE WRITTEN
PERMISSION OF REGAL MARINE INDUSTRIES IS PROHIBITED.
JAL
-
2800 Port Thru-Hulls
(H) Water Tank Vent
(H) Bow Thruster
(H) Port Drain
(H) Blower Vent
(B) Water Filling Point
(K) Towing Strong Point
(H) Docking Light