EasyManua.ls Logo

Retsch Twister - Slider

Retsch Twister
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating the machine
24
Fig. 15: Assembly of the filling funnel
Position the filling funnel (H) in the opening (W) of the grinding chamber
hood (I) until it locks in.
Depending on sample material, position the splashback protection (G) on the
filling funnel (H) until it locks in.
Pos: 7.34 /00005 Ü berschriften/ 1.1 Überschrifte n/1.1 Überschrift en BDA/11 Schi eber Verwen dung @ 4\ mod_1326191049 418_9.doc @ 26160 @ 22 @ 1
5.13 Slider
Pos: 7.35 /00010 Bedienungsa nleitungen Kapitels ammlungen/T wister Mill (2011) /0015 Zyklon Mill Twister Bedi enung/1556 NIR M odul Schi eber Verwend ung @ 4\mod _1325845379 549_9.doc @ 261 40 @ 33 @ 1
Abb. 16: Slider
1
2
3a
3b
G
H
G
H
W
I

Related product manuals