EasyManua.ls Logo

Riello NXC 021 - Defrost Function Operation; Master;Slave Unit System

Riello NXC 021
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PRO-DIALOG+
92
EN
runningforlessthanaminutethesystemautomaticallyre-
ducesthenumberofstart-upsbutinthiscasethecontrolon
the setpoint temperature is less effective.
Start-upscanbeinuencedbytheinterventionofotherfun-
ctions
suchasdefrost.
3.5.10 Night mode
Thisfunctionlimitsmachinecapacityoverasetperiodofti-
me. The period is set by accessing the GENUNIT menu and
simplysettingastartandnishtime.Usuallyitissetforthe
night time.
3.5.11 Control of optional electric heating elements
NXH units can manage up to four optional electric hea-
ting elements. Heating elements activate to compensate
the heat request to the machine in particular under these
conditions:
When the unit is already at its full capacity or when
itscapacityisreducedduetothetriggeringofsomesafety
devices
The outside temperature value is lower than the
setthresholdvalue(HCCONFIGmenu)
The demand limit function has not been activated.
Incasemorethanoneheatingelementisused,thelastone
couldbeutilizedasbackup,whichcanbeactivatedincase
of machine fault, supporting the other heating elements.
3.5.12 Desuperheater option
In units equipped with desuperheater it is possi-
ble to recover the heat from the hot water. The op-
tion is activated from the SETPOINT menu by setting
the min_sct parameter. It is also possible to use the
drycontacts(seeinputsMENU,DSHTR_SWparameter).
3.5.13 Defrost function
It is a function present also in the NXH series machines.
It is activated when the unit is in heating mode to pre-
vent the formation of ice on the air side exchanger.
Thedefrostcycleisperformedononelineatatime(in
caseofmachineswithtwoormorelines);duringthedefrost
phasethefanofthelineundergoingthecyclewillstopand
thefour-wayvalvewillinvertthecycleforcingthemachine
to
operateincoolingmode.Defrostcycle
isautomaticanddoesnotrequireanysetting.
3.5.14 Control of an auxiliary boiler
Thisfunction,aswellasthecontroloftheelectricheating
elements,isnotpossibleifthemachineisconguredas
Slave.
NXH units can manage an alternative source of heat such as a
boiler,bycontrollingitsstart-up.Whentheboilerisinope
-
rationtheunitisstopped.
Boilercanbeactivatedwhen:
• The unit is in heating mode but it is stopped due toan
error.
• Theunitisinheatingmodebuttheoutdoorairtempera
-
ture
istoolow.Usually,thesetthresholdvalueis-10_Kbut
itcanbeconguredfromtheHCCONFIGmenu.
3.5.15 Master/Slave unit
Two ProDialog+ can be connected together in a Master-
Slave unit system. The two controls communica-
te
through the CCN bus. Conguration parameters are
accessible
onlyfromthe SERVICE menu requiring the inter-
vention of the Technical Support Service.
The
Master-Slavesystemrequiresacascadingprobeforeach
machinetobeconnectedtothepipingcomingoutofthesystem.
The
systemcanmanagepumpswithxedandvariableow
rate;forunitswithvariableowratepump,eachunitcon-
trols
itspumpaccordingtotherequiredload.
Ifxedowratepumpsareusedinstead,thesearealways
runningevenwhenthesystemhasaloadrequest.Itispos-
sible
tohavetheMasterunittomanageonesystempump:in
thiscasetheSlavemachinepumpisnotused.
AllchecksandsettingswillbeperformedontheMasterma-
chine
thatwilltransmittheinformationtotheSlave.
TheMastercanbecontrolledfromtheunitpanel,remotepa-
nel
or CCN system. If the Master is controlled from remote
panel,usedrycontactstoturnsystemonandoff.
One of the Master-Slave functions allows establishing
not only which one is the Master and which one is the
Slave unit, but also inverting the roles if the operating
hours of the two units are a lot different. The system, if
congured,
willtrytokeeptheoperatinghoursofbothma-
chines
identical.
Shouldthesystemnotbeconguredasdescribedabove,the
machinechosenasMasterwillalwaysremainthatway.The
Mastermachinealwaysstartsrst,untilitreachesitsfullca
-
pacity.
Now a countdown starts for the Slave machi-
ne
that will be started once countdown is over.
The water setpoint used by the Slave machine is
the same of the Master machine.
During
cascading operation, the Master will always
work to its full capacity if the Salve is running, other-
wise
it can modulate its operation according to the
system
request. In case of communication error
between
MasterandSlave,thetwounitswillcarryonwor-
king
asseparatemachines,usingtheprogrammingsetfrom
each control panel.
IftheMastershutsdownduetoanerror,thentheSlavewill
startregardlessoftheMasterenablingsignal.
ForNXHmachinesinMaster-Slavecongurationorequip
-
pedwithatleastoneadditionalelectricheatingelement,
thecontrolmustbeontheenteringwatertemperature.

Table of Contents

Related product manuals