EasyManua.ls Logo

Rocky Mountain Element - Assembly Instructions; Bearing Installation

Rocky Mountain Element
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Assembly Instructions
1) Bearing Installation
1.1 Main Pivot
1) Using 6900 Bearing Press, install non-
drive-side Enduro 6900 2RS MAX
(1807042) Bearing.
2) Grease exterior of Main Pivot Spacer
(1807051), slide into main pivot.
3) Using 6900 Bearing Press, install drive-
side Enduro 6900 2RS Max Bearing.
4) Inspect bearings for proper seating
against front triangle.
1.2 Top Link & Chain Stay
1) Grease top link
bearing bores.
Do not grease
chain stay bearing
bores.
2) Using 6900 Bearing Press, install
Enduro 6900 2RS MAX (1807042)
Bearings into each pivot.
Note: Bearings press into chain
stay from inboard side.
3) Inspect
bearings for
proper seating
against
component.

Related product manuals