EasyManua.ls Logo

Rohde & Schwarz ZVB 4 - Replacing Generator Board (R&S ZVB4;8 Only)

Rohde & Schwarz ZVB 4
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Instrument Construction and Function Description R&S ZVB
1145.1078.82 3.42 E-4
Replacing Generator Board (R&S ZVB4/8 only)
(
See Chapter 5, Spare Parts List, Item 110 and
d
rawing 1302.4960.08)
Opening the instrument and removing the board
Remove the Reflectometer (see chapter Replacing a Reflectometer RM8 A510 to A540)
Remove the cover (130)
Remove the fan cable
Pull off the Generator Board (110)
Installing the board and reassembling the instrument
Fit the new Generator Board (110)
Reconnect the fan cable
Fit the cover (130)
Reinstall the Reflectometer (see chapter Replacing a Reflectometer RM8 A510 to A540)
Connect the mains cable and turn on at the mains switch. The instrument is now in the standby
mode
Select Service Level 2 (see Service Functions).
When the instrument has been started, check the protocol file for errors:
[ INFO : Error Log ]
Record the generator and receiver correction data (see Recording Correction Values).
Perform the factory system error calibration (see Factory System Error Calibration).

Table of Contents

Related product manuals