VLT
Vertical Process Pump
65 V1.090418
22. Place and tighten the hex bolts to secure the nozzle head to the last column pipe.
Figure 8.23 Placing and tightening the hex bolts to secure the nozzle head to the last column pipe.
23. Place a gasket on the shaft hole of the nozzle head.
Figure 8.24 Placing a gasket in the shaft hole of the nozzle head.