VLT
Vertical Process Pump
70 V1.090418
29. Install the coupling guard on the nozzle head.
Figure 8.33 Installing the coupling guard on the nozzle head.
30. Install the strainer in the bottom of the suction bowl.
Figure 8.34 Installing the strainer in the bottom of the suction bowl.