EasyManua.ls Logo

Samsung AM072BXV Series - Auto Trial Operation Flow Chart

Samsung AM072BXV Series
326 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Test Operation
Samsung Electronics 307
9-1-2 Auto Trial Operation Flow Chart
1) Auto Trial Operation Flow Chart
Perform preliminary inspection.
Perform Auto Trial Operation
- See the instructions on Key operation modes.
Error occurred?
Issue a report on the Auto Trial Operation result.
Is there an inspection
item indicated as "NG"?
Perform Trial Operation (cooling/heating)
- See the instructions on Key operation modes.
Is there an inspection
item that has an issue?
Inspection is complete.
Take corrective measures to resolve the issue.
(See the Service Manual)
Take corrective measures to resolve
the error and NG items.
(See the troubleshooting instructions
on NG items and the Service Manual)
Perform Auto Trial Operation again
Perform Trial Operation again
Yes
Yes
Yes
No
No
No
Precautions
- If issues occur on multiple components at the same time, the inspection accuracy may degrade.
- Items indicated as "Unidentified" in the result report are not items that have issues.
Some items are not inspected, depending on the installation environment and operation condition.
These items are indicated as "Unidentified".
- After resolving an error and NG items, be sure to perform Auto Trial Operation again.



9-1 Auto Trial Operation (cont.)

Table of Contents

Related product manuals