3.2.2.3 OPE
1. Pull up the OPE cover.
2. Remove 3 screws.
3. Lift up the OPE unit as shown below.
4. Unplug 2 connectors on the OPE PBA. And
release the OPE unit from set.
5. Lift up the OPE assy as shown below, and
Unplug the connector. And release the OPE
assy from set.
6. Disconnect the 2 harness, 3 exible pcb, and
remove the 4 screws. And then remove the OPE
PBA.