BA JDE BARISTA ONE_EN
V01 | 07.2016
23
www.schaerer.comOperation
Operation
Check before switching on
► Before switching on the coffee machine, check whether the following conditions are ful-
filled.
Conditions for switching on the coffee machine:
• The main water valve (in machines with a mains water supply) is open/the drinking water
tank is filled with fresh water.
• The drip tray has been emptied and is correctly inserted/the waste water outlet is correctly
routed/the waste water tank is connected.
• The bean hopper(s) is/are filled and the lock is open.
• The grounds container is empty and inserted correctly.
• The coffee machine is connected to the mains power supply.
Switching on
Option 1: Barista ONE up to 2 kW
► Plug the power cord into the machine.
► Insert the power plug into the socket.
► Switch on the coffee machine using the main switch at the lower back of the machine (next
to the power supply connection).
Option 2: From standby mode
► Briefly press the button on the right side of the operating panel.
The machine starts from standby mode.
The main screen appears, and the machine begins to heat up.
The machine is ready for use as soon as the required temperature is reached.
The figure shows the Barista ONE
with 2 kW and a removable power
cable
When the machine is switched on for the first time, a display-guided adjustment of the machine
configuration follows automatically.