EasyManuals Logo

SCHUNK ROTA TP User Manual

SCHUNK ROTA TP
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #44 background imageLoading...
Page #44 background image
Commissioning and maintenance
44 02.00|ROTA TP |en
Maintenance
A type WEH maintenance unit, consisting of filter, water separator,
and oiler, must be connected upstream of the power chuck. The
air enriched with oil supplies all sliding parts of the cylinder chamber
with an oil film. The oil level of the oil tank must be checked daily,
and oil must be added if necessary. If the oil consumption is too
low, i.e. if the oil level does not visibly drop over a period of 2 to 3
days, the oil adjustment screw must be opened slightly. Depending
on the accumulation of condensation, the condensation drain
screw must be opened occasionally.
2-part maintenance unit, type WEH with filter, oiler, and
pressure control valve
Type
WEH-1
ID number
0890021
Oil type
Shell Tellus S2 MA 32
Esso Febis
Connection
G 1/4"
Nominal pressure
10 bar
7.2

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SCHUNK ROTA TP and is the answer not in the manual?

SCHUNK ROTA TP Specifications

General IconGeneral
BrandSCHUNK
ModelROTA TP
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals