Mounting / connection / programming of the AFS3 138 PMI
16 01.00|1372106_AFS3 138 PMI_AFS3 138 MMS |en
Installing the AFS3 138 PMI to the NSE3 138 (-V1) (-K)
Installing the AFS3 138 PMI
The unit is installed to a VERO-S NSE3 according to the following
assembly steps
1 Select installation side on the quick-change pallet system.
2 Unscrew grub screw M5 clamping slide.
3 Unscrew fastening screws of the protective cover, remove
protective cover vertically.
4 Dismantle inductive position measuring system PMI from the
bracket of the assembly group carefully lay to one side.
5 Fix bracket to quick-change pallet system using two M4 screws.