EasyManua.ls Logo

Seaga JDL-2 COMBO - Page 15

Seaga JDL-2 COMBO
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15JDL V1.0 8 2022
Figure 14 – Retainer in Load Posion
Retainer
2.) 20 oz/591 ml Boles are loaded lying down, two deep in each column. Load the rst bole so that
the top touches the back of the column. The next bole should also be loaded with the top toward
the back of the column, posioned against the boom of the rst bole.
3.)12 oz/355 ml Cans (not slim cans) are loaded lying down, three deep in each column. Load cans with
the top of the rst can touching the back of the column. The boom of the next can should be touching
the boom of the rst can. The third can should be loaded with the top touching the top of the second
can.
4.)Finish loading to the top of the column, not exceeding maximum capacity (see chart), making sure
the items are not lted or skewed in the column.
5.)With column loaded, li the Retainer back into sales posion using the Locking Tab and push down
to lock.

Related product manuals