INSTALLATION
MANUAL
SEAKEEPER 3 90378 4 1 of 5
Section 3: COOLING INSTALLATION
3.0 Introduction
The Seakeeper 3 is shipped with the cooling circuit filled and ready for use. Only a quick
confirmation of glycol level is required.
Reference Drawings
90388 Seakeeper 3 Hardware Scope of Supply
90377 Seakeeper 3 Cable Block Diagram
90376 Seakeeper 3 Cooling Water Schematic
FIGURE 1 – SEAKEEPER 3