Seatex DPS 132 Installation Manual, rev. 0 Installation
43
SCID Station
ID
Station
Name
Link
No.
X Y Z Update
Cnt.
9999 10 Singapore 0 -1539413.70 6187795.05 152150.47 0
9999 470 St_Johns 0 2608693.08 -3432677.52 4684550.07 0
9999 151 Subic_Bay 0 -3110020.80 5325943.60 1620428.10 0
9999 620 Torshavn 0 2981315.97 353741.41 5608572.62 0
9999 690 Tromsoe 0 2102986.00 721726.00 5958258.00 0
9999 820 Trondheim 0 2814893.10 516629.56 5680970.61 0
9999 170 Valencia 0 2356429.49 -5820176.44 1118321.59 0
9999 830 Vardoe 0 1845130.62 1109396.96 5983718.55 0
Table 26 Example from the ST_COORD_DEF file
SCID Station
ID
Station
Name
Link
No.
X Y Z Update
Cnt.
9999 170 Valencia 0 2356429.49 -5820176.44 1118321.59 0
9999 235 Walvis_Bay 0 5689023.27 1471657.53 -2471672.99 0
9999 620 Torshavn 0 2980243.38 -353896.91 5609160.14 3
12 620 ??? 1 2980243.37 -353896.91 5609160.13 919
10 630 ??? 1 2795720.26 472317.90 5694200.24 919
9999 690 Tromsoe 0 2103842.93 721838.42 5957854.67 3
9 690 ??? 1 2103842.93 721838.42 5957854.66 919
9999 820 Trondheim 0 2814893.10 516629.56 5680970.61 0
2 820 ??? 1 0.00 0.00 0.00 53
9999 830 Vardoe 0 1845130.62 1109396.96 5983718.55 0
15 830 ??? 1 0.00 0.00 0.00 53
Table 27 Example from the ST_COORD.TXT file
3.11 Commissioning
The equipment will be commissioned after installation. A trained operator will fill out the
Commissioning Report with the necessary parameters. A copy of the Commissioning Report
should be inserted in the DPS 132 Site Manual, which is supplied with the product.