EasyManua.ls Logo

Seg System A2 H15 User Manual

Seg System A2 H15
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
S44-H15E
INSTRUCTION
SYSTEM A2
BELTWEIGHER MODEL H15
General information
Mechanical installation
Electrical installation
Commissioning and operation
Technical information
D
B
A
C
Question and Answer IconNeed help?

Do you have a question about the Seg System A2 H15 and is the answer not in the manual?

Seg System A2 H15 Specifications

General IconGeneral
BrandSeg
ModelSystem A2 H15
CategoryController
LanguageEnglish

Summary

General Information

System Overview

Provides an overview of the controller's basic functions and features.

Belt Scale Components

Details the main components of the belt scale system for sensing and measurement.

Delivery and Storage Guidelines

Instructions for protecting and storing the System A2 during shipment and use.

Mechanical Installation

Installation Location and Environment

Guidance on selecting an installation location and environmental considerations for the controller.

Electrical Installation

Electrical Installation Requirements

Details EMC protection and CE compatibility requirements for cable installation.

Terminal Connections Overview

Describes the procedure for connecting various electrical cables to the weighing system.

Optional Power Module Installation

Instructions for installing the optional 90-230Vac/24Vdc power module.

Loadcell Connection Procedure

Standardized connection technique for load cells using 6-conductor cables.

Power Up Sequence and Battery

Steps for powering up the controller and engaging the backup battery.

Serial Communication and Printer Setup

Information on RS485 interface, Modbus protocol, and printer connection.

Commissioning and Start-up

Start-up Procedure Overview

Explains the process of entering parameters for basic operation and initial setup.

Pre Start-up Checklist

A checklist of items to verify before initiating the controller's start-up procedure.

Detailed Start-up Steps

Step-by-step guide for entering necessary data during the start-up process.

Daily Operation

Front Panel Controls and Display

Describes the functions of the front panel keys and display indications.

Display Indications and Symbols

Explains the meaning of symbols and indications shown on the LCD display.

Error Messages and Troubleshooting

Lists common error messages and basic troubleshooting steps.

Printout Functionality

Details how to initiate and what information is provided by the printout function.

Technical Information

Menu System Navigation

Overview of the menu system structure and access to submenus.

Parameter Explanations

Detailed explanation of various parameters within the INFORMATION and SYSTEM DATA menus.

Controller Technical Specifications

Technical specifications covering design, display, power, connections, and inputs/outputs.

Maintenance

Housing Maintenance

Instructions for cleaning and maintaining the controller's housing.

Compliance and Standards

WEEE Compliance

Information regarding waste electrical and electronic equipment regulations.

RoHS Compliance

Details the product's compliance with restriction of hazardous substances.

CE Compliance Requirements

States compliance with relevant EU directives and EMC requirements.

EC Declaration of Conformity

Formal declaration of product conformity to EU directives and standards.