EasyManua.ls Logo

Segway x2 SE - Powerbase Chassis Disassembly and Reassembly

Segway x2 SE
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Segway Personal Transporter SE Service Manual
14–2
Powerbase Chassis
Powerbase Chassis
The inset in Figure 14–1 shows the numeral 2 and an arrow
stamped on the Chassis to indicate the front of the Chassis.
Disassembly
1. Make sure the PT is powered off, unplugged, and the
batteries have been removed.
2. Establish a Serviceable Powerbase (page 8–2).
3. Remove both Gearboxes (page 7–2).
4. Remove the Radio Board (page 9–3).
5. Remove the Console (page 9–4).
6. Remove the Chassis Cover (page 10–2).
7. Remove both CU Boards (page 11–2).
8. Remove the Balance Sensor Assembly (page 12–2).
9. Remove both Motors (page 13–2).
Reassembly
1. Install both Motors (page 13–2).
2. Install the Balance Sensor Assembly (page 12–2).
NOTICE
Use self-tapping fasteners when installing the BSA
into a new Powerbase Chassis.
3. Install both CU Boards (page 11–2).
NOTICE
Use self-tapping fasteners when installing the CU
Boards into a new Powerbase Chassis.
4. Install the Chassis Cover (page 10–2).
5. Install the Console (page 9–4).
6. Install the Radio Board (page 9–3).
7. Install both Gearboxes (page 7–2).
8. Reassemble the PT from the Serviceable Powerbase
(page 8–2).
9. Perform post-service tests (page A–1).
Figure 14–1: Powerbase Chassis
Front
Rear

Other manuals for Segway x2 SE

Related product manuals