EasyManua.ls Logo

Sekonic SR-3500 - Page 24

Sekonic SR-3500
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
-23-
Operation
Preparation
Operation
Preparation
(when stacker unit installed)
1.
Install the main tray on the main body unit. Hook the tabs on the end of the main
tray into the slots on the main device’s paper discharge side.
2.
Install the selection tray on the main body unit. Hook the tabs on the end of the
selection tray into the slots on the main device’s paper discharge side.
3.
Connect the power cord to the main device.
Main tray
Selection tray
When using the printer, operate P75 “ Stacker unit (printer) preparation ”
SR-3565(E).indd23SR-3565(E).indd23 2007-8-1610:18:512007-8-1610:18:51

Table of Contents

Related product manuals