0-2 
Section    Content  page 
4.2.2  The movement of the machine  …………………………………………
4-2 
4.2.3  The order to pack …………………………………………………………...
4-3 
4.3 Installation of the machine ………………………………………………
4-3 
4.3.1  Have the machine set onto the fastening bolts of the crate base  ……….
4-3 
4.3.2 Level adjusting. …………………………………………………………….
4-4 
4.3.3  The installation of the electricity  ………………………………………
4-4 
4.4  The test after installation  ………………………………………
4-4 
4.5  The procedure for dismantling the machine  …………………………..
4-4 
CHAPTER 5  Operation 
5.1  A brief introduction to the relevant operation hardware  ……………….
5-1 
5.1.1  (For TPR-1230, TPR-1230H)  ………………………………………..
5-1 
5.1.2  (For TPR-1600H, TPR-2000H)  ……………………………………...
5-3 
5.1.3  Safty protective device (suit every model)…………………………….…….
5-5 
5.2 Instruction to switches …………………………………………………..
5-6 
5.2.1  (For TPR-1230, TPR-1230H)  …………………………………………
5-6 
5.2.2  (For TPR-1600H, TPR-2000H)  …………………………………………
5-8 
5.3 
Installation of the clamp(work piece) 
……………………………….
5-9 
5.3.1 General …………………………………………………………………….
5-9 
5.3.2  Introduction of the vise and the clamping of the work piece  …………
5-9 
5.3.3  Universal clamp and the clamping of the work piece  ………………..
5-10 
5.4 Installation and change of the drilling bit  ……………………………
5-11 
5.4.1  The assembly and disassembly of the drilling head and clamp  ………
5-11 
5.4.2  The assembly and disassembly of the straight handle drill bit  ………..
5-13 
5.5  Power on and off  …………………………………………………………...
5-13 
5.5.1 Power on …………………………………………………………………...
5-13 
5.5.2 Power off …………………………………………………………………...
5-13 
5.6 Work light ………………………………………………………………….
5-14 
5.7 Cutting fluids ……………………………………………………………...
5-14 
5.8 Elevating the arm …………………………………………………………...
5-14 
5.9  Rotate the Gearbox right or leftwards  …………………………………
5-15 
5.9.1 
(For TPR-1230,TPR-1230H) 
…………………………………..
5-15 
5.9.2 
For TPR-1600H, TPR-2000H) 
………………………………………
5-15 
5.10  Rotate the arm forward or backwards  …………………………………
5-16 
5.10.1 (For TPR-1230,TPR-1230H)………………………………………………..
5-16 
5.10.2  (For TPR-1600H, TPR-2000H)……………………………………………...
5-16 
5.11  Change the spindle speed  ……………………………………………….
5-17 
5.11.1 (For TPR-1230,TPR-1230H) ………………………………………
5-17 
5.11.2  (For TPR-1600H, TPR-2000H)  ………………………………………
5-20