6.5 The Useful Life of The Key Parts of The Product
Maintenance and Repair
6.6.1 About the Machine
Model: SN: Manufacturing date:
Voltage:
V
Hz
kW
6.6.2 Check after Installation
Check the installation space is enough as required.
Check the pipes are correctly connected.
Electrical Installation
Voltage:
V
Hz
Fuse melting current: 1 Phase
A 3 Phase
A
Check phase sequence of power supply.
6.6 Maintenance Schedule
Total power:
Frequency: