EasyManua.ls Logo

SI Analytics TitroLine 7500 KF - Page 22

SI Analytics TitroLine 7500 KF
75 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
91
Chapter 2. Unpacking and First Operation
Fig. 21
Confirm the selection by pressing <ENTER>:
Fig. 22
At this point you can select the number of rinsing cycles (Fig. 19). Initial filling requires a minimum of two rinsing
cycles. You can stop the rinsing operation (Fig. 20) at any time by pressing <STOP> and then resume rinsing
with <START>.
Fig. 23
While the initial filling or rinsing programme is being run, please place a sufficiently dimensioned waste vessel
under the titration tip. The best is when the titration tip is mounted in the KF titration vessel.

Table of Contents

Related product manuals