EasyManua.ls Logo

SICK deTec4 Core Ex II 3GD - Integration in Electrical Control

SICK deTec4 Core Ex II 3GD
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Important information
DANGER
H
azard due to lack of effectiveness of the protective device
Systems of safety light curtains in close proximity to each other can mutually interfere
with each other.
b
Use appropriate measures to prevent systems in close proximity from interfering
with each other.
4.3.4.1 Using reversed direction of transmission
Using reversed direction of transmission
T
he direction of transmission of the system 2 can be changed during mounting by
switching the positions of the sender and receiver. With reversed direction of mounting,
the receiver 2 is not affected by the infrared light from the sender 1.
s
s
s
s
s
s
s
s
s
s
s
s
s
s
Figure 13: Trouble-free operation due to reversed direction of transmission of system
1
and
system
2
4.4 Integration in electrical control
Overview
T
his chapter contains important information about integration in the electrical control.
Information about the individual steps for electrical installation of the device: see
"Electrical installation", page 42.
Important information
DANGER
H
azard due to lack of effectiveness of the protective device
In the case of non-compliance, it is possible that the dangerous state of the machine
may not be stopped or not stopped in a timely manner.
b
Make sure that the following control and electrical requirements are met so that
the product can fulfill its protective function.
Requirements for use
T
he output signals of the protective device must be analyzed by downstream controllers
in such a way that the dangerous state of the machine is ended safely. Depending
on the safety concept, signal evaluation is carried out e.g. with safety relays or with a
safety controller.
It mus
t be possible to electrically influence the control of the machine.
The electrical control of the machine must meet the requirements of IEC 60204-1.
4 P
ROJECT PLANNING
22
O P E R A T I N G I N S T R U C T I O N S | deTec4 Core Ex II 3GD 8021796/1DCM/2022-10-27 | SICK
Subject to change without notice

Table of Contents

Related product manuals