EasyManuals Logo

Siemens 1FK7 Series User Manual

Siemens 1FK7 Series
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #46 background imageLoading...
Page #46 background image
Operation
8.3 Non-operational periods
Synchronous Motors 1FK7
44 Operating Instructions, 03/2011, 610.40700.40c
8.3 Non-operational periods
Measures for motors that are ready for operation but which are presently not being used
If the motor is out of service for extended periods of time, operate it at regular intervals
(roughly once a month) or at least spin the rotor.
Refer to the section "Switching on" before recommissioning the motor.
NOTICE
Damage due to improper storage
The motor can be damaged if it is not stored properly.
If the motor is out of service for extended periods of time, apply suitable anti-corrosion,
preservation and ensure that it is kept dry.
When recommissioning the motor after it has been out of service for a longer period of
time, carry out the measures recommended in the Chapter "Commissioning".
EUROSERVO SERVO MOTOR TAMİR MERKEZİ
WWW.EUROSERVO.COM.TR

Other manuals for Siemens 1FK7 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens 1FK7 Series and is the answer not in the manual?

Siemens 1FK7 Series Specifications

General IconGeneral
Product typeSynchronous motor
EncoderIncremental encoder, absolute encoder
Cooling methodNatural cooling, forced-air cooling
Degree of protectionIP64, IP65
Speed rangeUp to 9000 rpm
Feedback systemEncoder or resolver

Related product manuals