4 - 1
Siemens AG SPR8-125.034.02 Page 1 of 2 POLYMOBIL Plus
Medical Solutions Rev. 02 03.05 CS PS 24
Final procedures 4
Protective conductor test 4
Observe the information on the protective conductor test in these instructions.
• Perform the protective conductor test with the system closed according to ARTD-
002.731.17...
The protective conductor resistance must not exceed 0.2 ohms.
• Record the determined values as first measured values in the report ’Protective
conductor resistance / report’ (Chapter 6 of these instructions) stating the measuring
points.
• In addition document the measuring method and the measuring instrument used
(designation and serial number).
Device leakage current measurement 4
Observe the information on the device leakage current measurement in these instruc-
tions.
• Perform the device leakage current measurement with the system closed according to
ARTD-002.731.17...
The limit of 2.5 mA must not be exceeded.
Electrical voltage!
Non-compliance can lead to severe injuries up to death.
In the direct measurement of the device leakage current no hous-
ing parts of the system may be touched during the measurement.
Access to the system for third persons must be prevented.
Fig. 1
WARNING