EasyManua.ls Logo

Siemens SIMATIC IPC BX-39A - Commissioning the device; Switching on the device

Siemens SIMATIC IPC BX-39A
115 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SIMATIC IPC BX-39A
46 Operating Instructions, 07/2022, A5E50715883-AA
Commissioning the device
4
4.1 Switching on the device
Requirements
The power supply is connected.
Procedure
1. Switch the ON/OFF switch at the front of the device on ("ON" position when the symbol "_" is
pressed in).
Information on the position of the switch is available under "Interfaces and operating
elements (Page 13)".
Commissioning the installed Windows® operating system
You can find information on first startup of the device and commissioning the installed
Window operating system in the operating system documentation.
See also "Important instructions and manuals for operating the device (Page 9)" for more on
this.
4.2 Switching off the device
Shutting down the operating system
For active operating system
Shut down the operating system properly.
Result
The "POWER" operating display is lit yellow.
The device is switched off but not fully disconnected from the line voltage.

Table of Contents

Other manuals for Siemens SIMATIC IPC BX-39A

Related product manuals