EasyManua.ls Logo

Siemens Simatic S7-400

Siemens Simatic S7-400
332 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 Machine information 03/2013
2.3 Test series on the machine
© Siemens AG 2006-2013 All Rights Reserved
2-68 SINUMERIK Integrate AMB, AMC, AMM, Function Manual (FH) - 03/2013
PROG_END:
G4 F1
; is required for synchronization
M17
2.3.5 Measurement commissioning
Function description
The prolog and epilog program must be edited in order to perform measurements.
If measurements are performed on a machine for the first time, or if the prolog and
epilog program has been deleted, then a preconfigured prolog and epilog program
takes effect, which prevents the further execution of the NC programs as the NC
program code runs in an endless loop. This part of the preconfigured prolog and
epilog program must be deleted. A program code adapted to the requirements of
the machine must be used for the prolog or epilog.
Fig. 2-41: Prolog and epilog program

Table of Contents

Other manuals for Siemens Simatic S7-400

Related product manuals