EasyManua.ls Logo

Siemens SINAMICS PERFECT HARMONY GH180 - Visual Inspection

Siemens SINAMICS PERFECT HARMONY GH180
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.2 Visual inspection
The visual inspection is performed to ensure that the equipment complies with the order
specifications. The tests are carried out with the drive in a no-voltage condition.
The visual inspection together with the customer – or with the company accepting the
equipment is carried out with the drive installed and labeled. Each test step is documented in
the acceptance report with the specific results of the step.
The visual inspection is part of the function test (F72, F73).
Visual inspection Order codes
Without the
customer
present
With the cus‐
tomer
present
Rating plate
Housing degree of protection
Electrical cabinet components
Cable installation
Cable markings
Setting values of circuit breakers, if used
Dimensions
-
F03
See also
Visual inspection (Page 16)
General scope of services
2.2 Visual inspection
SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15
12 Reference Manual Rev.201902141441 GH180

Table of Contents

Other manuals for Siemens SINAMICS PERFECT HARMONY GH180

Related product manuals