3.4 Interface test
3.4.1 Interfaces
Fundamentals
The customer or its representative parameterize and test the communication of selected
interfaces with their own test equipment. Factory personnel are available to operate the test
station. Only auxiliary power is provided. The interface test is limited to five hours.
Test procedure
1. Using his own test equipment, the customer establishes the hardware connection to the
drive.
2. Factory personnel switch on the auxiliary voltage.
3. The customer establishes the software connection to the drive.
4. The customer parameterizes and tests the communication of selected interfaces.
Result
The interface test has been completed after five hours.
Tests
3.4 Interface test
SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15