2.4 Insulation test
The insulation resistance is measured before and after the high-voltage test. The insulation test
can only be ordered and carried out together with the function test (F72, F73).
Insulation test Order codes
Without the
customer
present
With the cus‐
tomer
present
● High-voltage test
● Measuring the insulation resistance
F76
F77
The successful test is confirmed in a 3.1 certificate – or in the case that the customer has
ordered the acceptance test, in a 3.2 certificate.
The insulation test is performed on a separate acceptance day prior to the function test.
General scope of services
2.4 Insulation test
SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
N30 N35 N44 N75 M08 U10 Y15