Installing the lifting column 3 - 7
Siemens AG Register 3 SPR2-130.033.02 Page 7 of 10 SIREMOBIL Compact
Medical Engineering Rev. 02 12.98 TD SD 24 System Manual
• Plug in the connectors.
• Attach the protective conductor to the base plate of the line filter with the screw; insert a
contact washer under the cable terminal.
Installing the TV power supply M13 3
• Insert the TV power supply into the holes in the floor of the unit ; however, don’t tighten it
yet.
• Pull the cables under the TV power supply and plug in the connections to the board:
• Solder the wires to the transformer:
• Lift out the TV power supply once again and install the Plexiglas cover.
• Reinstall the TV power supply and secure it from underneath the unit with 4-M4 nuts and
washers.
• Secure the protective conductor with the screw to the floor of the unit and to the chassis.
Insert contact washers under the cable terminals.
Installing boards D1 and D2 3
• Secure the heatsink on the control side of the lifting column (Fig.15).
• Attach the 6 spacer screws to the heatsink and tighten them (Fig.15).
• Apply conductive paste to the contact surface of the heatsink.
• Position board D2 on the spacer screws and tighten it to the heatsink (Fig.15).
• Connect the plugs on board D2.
• Secure board D2 with the spacers Fig.15.
• Install the interface plate.
• Position the spacers on the 6 screws.
Black wire to 2 Red wire to +
Green/yellow = protective
conductor
red wire to 0 V yellow wire to 220 V