EasyManua.ls Logo

Siemens SOMATOM Spirit - Page 381

Siemens SOMATOM Spirit
484 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Quality Assurance Daily Quality Measurements
0.0
04/2012
0.0
F.2-5
0.0
F.2
Press the Start key on the control box.
The position of the phantom set is checked and displayed. Then,
the first measurement is started automatically.
F. 2
i
.2
F
For incorrect positioning of the phantom set, a message is dis-
played. Correct the position, if necessary.
F. 2
For each tube voltage (kV step), two measurements are per-
formed.
F. 2
After each measurement, a CT-image of the water phantom is
displayed in the active segment.
F. 2
F. 2
The difference between the first and the second measurement
is calculated and displayed.
F. 2

Table of Contents

Related product manuals