EasyManua.ls Logo

Siemens Sonoline G20 - Page 8

Siemens Sonoline G20
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8 SONOLINE G20 System Delivery Procedure
SONOLINE G20 US06-101.812.01.02.02 Siemens
10.04 sd
Page 8 of 26
Medical Solutions USA, Inc.
6. Install the two roll-out ramps.
- Place the two ramps on the ramp studs.
The ramps studs are located on the front side of the shipping crate. The ramp planks
have one hole at the end that is placed on the floor and two holes at the end that is
placed on the ramp stud.
Fig. 3: Ramp Plank Placement
7. Unfold and lay flat the cardboard shipping base.
Fig. 4: Shipping Base Cardboard
8. Remove the plastic cover from the ultrasound system.
9. Roll the system off the shipping pallet.
- Disengage the brakes on each wheel.
- Carefully roll the system off the shipping pallet, down the ramps previously installed,
and on to the floor.
10. Go to the next section for instructions to power on and verify the ultrasound system.

Other manuals for Siemens Sonoline G20

Related product manuals