18 – 3
The following is the bill of material and tools required to install the shutter.
Bill of material
(1) Shutter subassembly (1 unit)
(2) Socket head cap screws M6x10 with locking coating (8 units)
(3) Shutter spring assemblies (4 units)
Tools required
(4) ¼ inch slotted-type screwdriver
(5) 5 mm hex socket screwdriver
(6) Torque wrench with 5 mm hex socket bit